Skip to main content
Loading…
This section is included in your selections.

Should the subdivider be required to construct or reconstruct a community arterial within a proposed subdivision and if that community arterial is designed to serve areas of the city other than just the proposed subdivision, the city may participate in the cost of construction. The City Council shall approve the percentage of participation prior to bonding or bid award for community arterial construction.

A. The city's maximum participation will only be for the required extra width and construction materials which are over and above the forty feet (40') of pavement width required of a residential street.

B. In a residential subdivision containing lots which front on a residential street and have an arterial street parallel to the residential street and adjacent to the back lot line, those lots shall be defined as through lots. The city's maximum participation shall be fifty percent (50%) of the sidewalk construction costs along the arterial on all through lots.

C. In no event should this ordinance be construed to establish an affirmative obligation upon the city to participate, or to participate in any fixed percentage in any project. The city's participation shall be limited by the funds available, priority of projects throughout the city, and the desirability of the particular project.